Construction Observation for Delta Maintenance Hangar in LAX

  • yunsoo
  • Sep 27, 2019
  • 1 min read

Updated: Nov 2, 2019

Second site observation on October 30, 2019. Palo Verde tree inspection, tree pit preparation, planting locations were inspected. Irrigation main line was installed and water pressure was tested.


Getting ready to install Palo Verde

Importing amended soil for planting


Installing irrigation controllers